• 2018-02-06 15:07:04
2017 New 3500m3/H Hydraulic Cutter Suction Dredger

First,The cutter suction dredger is used of front suction pipe installation of rotary cutter device,the sediment of cutting and stiring. Second,To the proper proportion in the mixing process of slurry mixing in cutting ,through the powerful suction pump,take the suction material transported to designated locations through the wind pipe. Next,The cutter suction dredger will wring,suction,material transport,unloading,a series of links,can be continuously completed once.


Chat Online Leave Message

2017 New 3500m3/h Hydraulic cutter suction dredger

Hydraulic_Cutter_Suction_Dredger_Beijing_HOT_Mining_Tech_Co_Ltd_06

Product Features:

  1.  The cutter suction dredger has a wide range of terrain and environment adaptability,It can be used in sea,inland river,lake,reservoir for long time all-weather operation in A/B navigation area.

  2.  The cutter suction dredger applies the international standard,with PLC contronl system and mechanical operating system,making it easy to operation. The work efficiency is greatly increased.

  3.  The cutter suction dredger expoitates the ore in sector shape,has a range of mining.

  4. The cutter suction dredger with high degree of mechanize,can discharge long disthance,maximize saving and reduce the number of intermediaries and expense

Working Principle:
First,The cutter suction dredger is used of front suction pipe installation of rotary cutter device,the sediment of cutting and stiring.
Second,To the proper proportion in the mixing process of slurry mixing in cutting ,through the powerful suction pump,take the suction material transported to designated locations through the wind pipe.
Next,The cutter suction dredger will wring,suction,material transport,unloading,a series of links,can be continuously completed once.

Hydraulic Cutter Suction Dredger Parameters
Hydraulic_Cutter_Suction_Dredger_Beijing_HOT_Mining_Tech_Co_Ltd_07
We also can supply other configurations upon customer's request.
For the solution or quotation, please inform us:
1. the required work capacity of water flow
2. the max. dredging depth

3. the discharge distance